damith .s. munasinghe associates
Design was done on a half structure.Project was completed in a few months though squire footage of the building is considerably higher, as the operations wanted to be started sooner.Design was managed to do using available structures, materials and labor capacities.The project was almost remote controlled since the location was far away from Colombo.
chartered architects
interior designers